Dubai Mall vs. Abu Dhabi Central Market Comparison Report

The United Arab Emirates has experienced rapid development through the building and construction of and skyscrapers (Abravanel, 2001). Just over 10 years ago, downtown Dubai did not have many buildings. The streets were open and the area was verse. However, from the beginning of the new millennium, Dubai has experienced rapid construction of new buildings and skyscrapers that have been constructed using the latest technology and expertise (Bidgoli, 2004). It is now quite difficult to compare the look of the old city with that of the new one. Buildings such as Burj Al Arab, Burj Khalifa and the Abu Dhabi Central Market are just bit examples of buildings that have been constructed recently giving the UAE a whole new look.

This paper will focus on two buildings in the United Arab Emirates; The Dubai Mall and the Abu Dhabi Central Market. It will critically analyze the differences and similarities of these two buildings. It will also focus on the cost that was incurred to construct the buildings, their qualities, size (in terms of area), height, the materials, methods and equipment used in the process of construction, the time it took to construct the buildings and their ages. All these factors will be critically analyzed in this paper in order to get an in-depth understanding of the architecture and construction of these two buildings.

Don't use plagiarized sources. Get Your Custom Essay on
Dubai Mall vs. Abu Dhabi Central Market Comparison Report
Just from $13/Page
Order Essay

Architecture and Construction
These two buildings have been constructed using the latest technology, tools, materials and techniques that are available (Herczog, 2011). The owners, architects and contractors have astonished the world by taking building and construction to a completely new level. They have faced astonishing challenges, overcome setbacks and applied their innovations coupled with the use of the latest technology and skills to give out desirable results that have amazed not only the people of UAE but the entire world. The two structures that will be discussed in this paper have gained the same recognition and respect all around the world.

As stated earlier, The Dubai Mall is one of the latest and most creative buildings in terms of construction and architecture in the United Arab Emirates. The mall is located in downtown Dubai, next to the worlds tallest building, Burj Khalifa (Nambiar, 2008). The total cost of construction is estimated to be around $20 billion. The building has been rated as the largest mall in the whole world. It has a total retail floor area of 3.7 million square feet, over 12 million square feet total area and a height of 629 feet (Ahmed, 2009). This size is nearly equivalent to fifty football fields. the interior finishing of the mall is superb. It is fitted with an indoor aquarium and an underwater zoo. It also has a fashion avenue that is about 440,000 square feet and several theatres, fast-food restaurants and other entertainment facilities (Gillespie, 2010).

Dubai Mall
Fig. 1: Dubai Mall
Construction of the building began on 4th May 2004 and lasted for four years. It was completed and opened to the public on 4th November 2008 (Jones, 2010). The building is now approximately three years old. However, the building had been delayed on two occasions due to technical difficulties. It was initially expected to be completed in 2006. Despite this, the 2008 completion was successful and on opening, the mall had over 600 retailers and received over 750,000 visitors daily. Built on the worlds tallest building, the mall and the larger building have a height of 700 meters and 160 floors (Sofroniou, 2010).

The main materials that were used in the construction were concrete and steel. The main structural system consisted of three subsystems namely: the lateral load resisting system, the floor framing system and the foundation system (Abdelrazaq et al, 2008). The lateral load resisting system was constructed mainly with the use of reinforced concrete ductile walls at the mechanical levels. The floor framing system consisted of flat framing slabs that span at least 9 meters between the exterior column and the interior walls. The foundation system was also made up of concrete slabs. By the end of construction, the building had used over 13, 550 tonnes of steel; more than what was used to construct the Eiffel Tower (Salvendy, 2009). These were the basic materials and methods that were used in the construction of the building.

On the other hand, the Abu Dhabi Central Market is still under construction. The first phase of the project has just been completed. The construction is a development that will have multiple uses once completed. The project comprises the construction of three megastructures; The Domain, Trust Tower and (Adam, 2010). The tallest of these three towers will be 382 meters long (Adam, 2010). This will be the tallest building in Abu Dhabi. However, as compared to Burj Khalifa where the Dubai Mall is situated, this building is relatively shorter.

The Central Market
Fig. 2: The Central Market
Construction of the building is being done in three phases. The first phase was the construction of the central market. This phase was completed in the last quarter of the year 2010 (PERIM, 2011). The tower is thus barely less than one year old. This tower was constructed on the Arabian Souk and covers an area of 14,500 square meters. This building was constructed using the latest technology. It is one of the many projects in Abu Dhabi that has been constructed using environmentally friendly technology. The materials that were used in the construction of these buildings.

The construction of both modern and traditional methods of architecture. Like the Dubai Mall, the Central Market tower was constructed using a mixture of steel and concrete. However, the roof, the ceiling and the walls of the building have been constructed in a remarkable manner. The roof and ceilings are retractable. This aimed at improving the lighting of the building while using natural sources of energy, which in this case is the sun. As a result, visibility in the building has been improved and at the same time, the energy consumption has been reduced (The National, 2011).

Project Summary
The Dubai Mall The Central Market
Stakeholders Emaar Properties Aldar Properties
Contractors Turner International (contractor)
Samsung, Korea base contractor;
Besix, Belgium base contractor; and Arabtec, Dubai base
Contractor (subcontractors)

Foster and partners (contractor)
Halvorson and Partners, , BDSP Partnership, DPA Lighting Consultants, Emmer Pfenninger and Partners, Lerch Bates and Associates, Systematica, Warrington Fire (subcontractors)
Problems during construction The sandy nature of the soil made the setting of the foundation to be difficult No major problems have come up so far
Similarities These projects were constructed in UAE using the latest technology. They are used for accommodation, shopping, offices and entertainment.
The contractors had a duty of gathering the labor force, materials and equipment and ensuring that the project is completed on time.

Conclusion
For the last two decades, there has been a lot of building and construction in the United Arab Emirates. This has led to the emergence of high-quality buildings that have been constructed using the latest technology. The Dubai Mall in Dubai and the Central Market in Abu Dhabi are examples of recently constructed buildings in the region. Both of these buildings have been constructed using the latest technology and are used for shopping, accommodation and recreation. However, some differences were also identified in the manner of construction. While the Dubai Mall (Burj Khalifa) was constructed using normal materials and equipment, Central Market was constructed using materials that are environmentally friendly. These materials reduce the use of manmade energy sources thus minimising the carbon emissions in the atmosphere. Construction projects should therefore adopt this trend to ensure that we have a clean and safe environment as we experience infrastructural development.

 

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with Essay Help Republic
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Mathematics
on time and very legit!
Customer 452447, May 18th, 2022
Other
Nice job!
Customer 452459, September 27th, 2022
Other
i love every detail of the paper. am sure i'll get an A+
Customer 452459, September 27th, 2022
Classic English Literature
Awesome Work. Highly recommend the writer
Customer 452461, November 21st, 2022
Classic English Literature
awesome research and organization
Customer 452451, May 26th, 2022
Classic English Literature
no errors and top-notch grammar
Customer 452451, May 26th, 2022
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
error: Content is protected !!
Open chat
1
Need assignment help? You can contact our live agent via WhatsApp using +1 718 717 2861

Feel free to ask questions, clarifications, or discounts available when placing an order.