Hoover Dam in the Black Canyon of the Colorado River

Hoover dam is built in the Black Canyon of the Colorado River in the United States and is located on the border between Arizona and Nevada. Construction of the dam, which began in 1931 and completed in 1936, was a result of great effort that was made possible by thousands of workers, some of whom died during the construction process (Burns 1). These workers were united under a conglomerate known as Six Companies, a group of six construction companies formed to build Hoover Dam. The number of contracted workers reached 5,251 by July 1934, most of who had come from other states, the total number of employees during the construction was 21,000 men.

The main purpose of the dams construction was to control periodic floods, provide a regular water supply for states around this area, namely Nevada, California and Arizona, generate hydroelectric power and improve transport activities on the Colorado River. The dam is a source of water for irrigation and its construction led to the formation of Lake Mead, a 233 sq. foot water body that is used for leisurely activities such as fishing and sailing (Cohn). Hoover Dam has a height of 726.4 feet (221 m), is 660 feet (201m) wide and has a total volume of 3,250,000cubic yards (2,480,000 m3). The was constructed at its base and consists of 17 turbines, nine of which are in the Arizona while eight are in Nevada. These turbines produce 4.2 billion Kilowatt-hours on average.

Don't use plagiarized sources. Get Your Custom Essay on
Hoover Dam in the Black Canyon of the Colorado River
Just from $13/Page
Order Essay

An aerial view of Hoover Dam
An aerial view of Hoover Dam
Construction of the dam began with the diversion of the Colorado River to give space, as the dam was to lie on its path. This was done by digging four diversion tunnels through the Black Canyon, these were roughly 56 feet in diameter and approximately 4,400 feet long and were constructed during the late fall and winter when the water levels were low and diversion was easier. Two tunnels were dug on the Nevada side and the other two on the Arizona side of the canyon, explosives were used to create these tunnels, and a ton was used for every 14 inch of tunnel made (Duchemin 4). They were then lined with concrete, starting with the base; this was done by the use of gantry cranes moving on rails. Next were the walls and workers used movable steel structures for this purpose, finally, the roof were lined using pneumatic guns. After lining, the tunnel diameters reduced to 50 feet (15 m). The Colorado River was then diverted to the Arizona tunnels while those in the Nevada side were left to be used during the fall.

To protect the workers at the site from the Colorado River, two cofferdams were constructed to protect against the likelihood of the river flooding, they were 96 ft (29 m) high and 750 feet (230 m) thick, it was thicker than the dam. Once these were built and the river diverted, the work of digging out the foundation for the dam began, first, the erosion soils that had built up were removed until the bedrock was reached and since the dam was an arch-gravity kind, the side walls were dug out too as the canyon would support the dams weight. Loose rock on the wall of the canyon were removed by high scalers as these posed a danger to the workers; high scalers were suspended using ropes (Dunar 5).

Concrete was poured into the dam in the early June of 1933 and since concrete heats and contracts as it dries, the possibility of uneven cooling posed a challenge to the workers. Government engineers determined that the concrete was poured in a single continuous process, it would take 125 years for the concrete to cool and this would lead to weaknesses that would lead to weaknesses on the wall and subsequently crack (True 2). To solve this, the excavated area was marked with rectangles and concrete blocks poured into the area. 1-inch steel pipes were inserted into the blocks and were used to pass river water and ice, once the blocks had cooled, the workers filled the pipes with grout, the spaces between the blocks were also filled up using grout and this enhanced the strength of the structure (Hiltzik 5).

A picture of Hoover dam showing the concrete blocks.
A picture of Hoover dam showing the concrete blocks.
Concrete was carried to the site in large steel buckets with a height of 7 feet (2.1 m) and almost the same diameter; they were filled at huge concrete plants located on the Nevada side of the canyon. They were transported to the site by specially made rail cars suspended on aerial cables; these buckets were moved to the right columns (block) and opened up from the bottom, workers the evened out this concrete. These buckets had to be moved to the right blocks, as each block required a specific grade of concrete, from to in diameter. More than 3,250,000 cubic yards (2,480,000 cubic meters) of concrete was used in construction and a total of 1,110,000 cubic yards (850,000 cubic meters) used at the power plant and other construction sites (Marsh 12). The pouring of concrete was completed in May 1935; two years after the diversion pipes had been built.

Cofferdams had been constructed over tunnels 2 and 3 and when winter set in, they were built over tunnel 4 while tunnel 1 was fitted with valves to control water flow. On February 1935, a 1,000 ton steel structure was lowered over tunnel 4, the cofferdams were the it possible to control the Colorado River. Water began to flow into Hoover Dam and this marked the end of its construction (United States Energy Information Administration 1). The summary of the construction plan is shown in the diagram below (Rodriguez 12).

Hoover Dam in the Black Canyon of the Colorado River
Spillways
Two spillways were constructed behind each of Hoover Dams abutments and run almost parallel to the walls of the canyon, each spillway is fitted with gates that can be raised or lowered depending on the water levels in the dam and flood conditions. Water flows over the spillways and drops 600 feet into 50 feet wide tunnels, it then flows to the outer diversion channels and rejoins the river.

A view of the dam from the downstream end showing the spillway
A view of the dam from the downstream end showing the spillway.
Completion of the dam construction has led to some negative environmental impacts, ten years after its construction; more than 600 earthquakes have been reported with magnitudes ranging from 2 to 5. The earthquakes were common during the early years due to the high level of water; the instances of seismic activities have however fallen due to a drop in water volumes over the years (Stevens 10).

 

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with Essay Help Republic
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Classic English Literature
no errors and top-notch grammar
Customer 452451, May 26th, 2022
Other
i love every detail of the paper. am sure i'll get an A+
Customer 452459, September 27th, 2022
Mathematics
on time and very legit!
Customer 452447, May 18th, 2022
Classic English Literature
Awesome Work. Highly recommend the writer
Customer 452461, November 21st, 2022
Other
Nice job!
Customer 452459, September 27th, 2022
Classic English Literature
awesome research and organization
Customer 452451, May 26th, 2022
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
error: Content is protected !!
Open chat
1
Need assignment help? You can contact our live agent via WhatsApp using +1 718 717 2861

Feel free to ask questions, clarifications, or discounts available when placing an order.