Shipyard Design and Layout Report Assessment

An excellent ship construction layout employing current cost effective and efficient methodologies, ship construction standards, and ship construction concepts constituted the best approach to of the proposed facility. The basic design requirements and specifications and innovativeness formed the basis of the design.

The report looks at innovative approaches to challenging constraints experienced both in the design and implementation of the ship yard on the physical location of the facility. This was in accordance with the research conducted into to optimize production, expertise, budget, and space.

Don't use plagiarized sources. Get Your Custom Essay on
Shipyard Design and Layout Report Assessment
Just from $13/Page
Order Essay

The research incorporates a comprehensive analysis of the 25 metre vessels capacity and the new design approach. The facility will consist of twin 6000 tonne building berths, 450 tonne transporters, equipped workshops, system integration and communication systems for surveillance systems according to international and national standards and conventions.

Methodology
Weight factors were then rated in the order of critically essential, specifically vital, vital, normal, not vital, and undesirable and labeled appropriately with letters. Different activities are incorporated in the production process. The first phase, according to the design incorporated a critical analysis of the available space, land topology, and water depth and the best design for optimal utilization of those aspects (Matulja 2).

In addition expert knowledge, creativity, an analysis of the shape, size, and capacity of the 25 metre vessel capability, its layout and the required infrastructure compared to the current infrastructure, the area to which the facility is to be bounded by sea, and available technology.

Layout and the Rationale Behind
This design incorporates elements of smooth work flow and materials, uniform application of workloads on production tools, and budgetary constraints. In addition the workforce shift capacity, and work flow are part of administrative activities. The rationale behind this layout is efficient space, budget, time, workflow, and site utilization with the available technology and future aspects as envisaged in the previous feasibility study report.

Phases Interconnected Activities
One Evaluating production area
Assessing workflow

Analysis of current technologies

Validating technology with feasibility plan

Two Design of workflow
Space calculations

Creating the design

Three Identifying budget
Identifying constraints

Future expansion

Hierarchical modelling

Four Sensitivity analysis and standardizing workflow
Procedures and the Rationale Behind
Phase One
The methodology focuses on efficient space utilization as detailed in the diagram illustrated below proposed by (Singh and Wang 3). At this stage, the production area was identified based on the aerial map and picture of the construction site. Each production area is numbered, a combination in the process to determine the flow of production of ships. Technologically, weights for the area are critical in determining the flow in the production process. The A, B, C D, E, F corresponding to numbers 0, 1, 2, 3, 4, and 5. The weight factors, in the order of 45, 11, 3, 1, and 0 were correspondingly assigned letters A, B, C, D, E, and F. each weight factor corresponded to a closeness factor in the listed orders as illustrated below. Thus the data was used to design the flow that could provide optimal use of the facility.

Code number Closeness Letter Weight factor
5 Critically essential A 45
4 Specifically vital B 11
3 Vital C 3
2 Normal D 1
1 Not Vital E 0
0 Undesirable F -45
Site Map
Site Map
The diagram indicates the area for section finalizing, the blasting and section painting, forming, outfitting, and pipe cutting and the smiths workshop.

Phase Two
These results led to phase two of the design. The flow intensity is regulated among different work positions where all materials flow in the direction indicated in the flow charts (Muther 4). At the design stage, data validation and verification should be incorporated spanning the quantity, routing or direction, the product, specific support, and the time required.

All the working relationships should be clearly identified and be in close proximity to optimize the design and production activities. The strength of the relationships between the activities in the design determines their proximities.

This aspect incorporates future expansion capabilities, space utilization, and clean room requirements that may place additional constraints. An analysis indicated requirements such as the size, shape, relationships between production points, and the approach in organizing the spatial arrangements consistent with the production areas. Its worthy noting that the use of software in the design drastically facilitated the design process.

The use of templates and CAD were critical components in the design process. A mathematical relationship between the number of closeness (Y), weight factor and closeness (w), the SLP(s) score, and the number of production areas are related in the equation: S= w.Y. To obtain optimal flow and production, the design is made so as to obtain a large value of s.

The design incorporates other constraints such as the available budget, the feasibility plan consistent with the manufacturing target capacity and available human resource personnel and expertise skills and requirements in line with the companys goals. The best design was arrived at using software tools at the designers disposal. The current feasibility plan and future design considerations were factored at this stage since possibilities for future expansion were rife.

Phase Three
At this phase, an Analytical hierarchical Process was used. This structured technique provided critical support in resolving complex issues related to the constraints highlighted above. This design spans the psychology and mathematical relationships between the elements in the production process (Matulja, Fafandjel & Zamarin 36). The criteria for the design included software costs, SLP score, available budget, a feasibility study, and geographical considerations as illustrated on the picture and provided map.

Based on the saatys scale, the elements are compared in terms of the strength of the relationship between them. At the top most level is the goal with the hierarchy of the related elements following in order, according to the equation, K (K-1)/2 for each hierarchical level as proposed by (Matulja, Fafandjel & Zamarin 3).

Phase Four
This led the designer to determine the degree of stability of the solution design, inclusion and variations of the hierarchical parameters, and identification of the most critical parameters in the design based on operational research methods. A sensitivity analysis on the data and design based on operational research methods was also done.

Proposed Construction Process
According to the design, the could involve construction of the mock, appropriate fixtures, and the jigs followed by the cut out plate. The cut out plate and assembly include pre-fabrication activities. The shell is constructed with emphasis on the mock in an inverted construction procedure followed by the structural outfit.

Eyres discuses the deckhouse is install ion to specifically consisting of the pilot house, and the Aluminum pilothouse (8). Other machineries and equipments are installed at this point as critical alignments are done.

Electrical installations are done in the process and other electronic devices such as communication equipments. The ship undergoes final painting and launched. At the launch pad, the ships machinery is thoroughly tested, sea trials are conducted, and the final product is delivered on time and according to the budget as discussed by (Ahmad 23).

Shipyard Design factors for the success
Discussion
The discussion provides a view of the design and implementation of the in view of constraints such as the budget, manufacturing technologies, materials, the land topology, water depth, and available expertise.

Other factors for the success of the project include excellent work ethics and high productivity. Other success factors for consideration include buffer zones; raw materials supply chain, inventory management and movement, and available technologies. That could make the company realize an optimal facility.

 

Calculate the price
Make an order in advance and get the best price
Pages (550 words)
$0.00
*Price with a welcome 15% discount applied.
Pro tip: If you want to save more money and pay the lowest price, you need to set a more extended deadline.
We know how difficult it is to be a student these days. That's why our prices are one of the most affordable on the market, and there are no hidden fees.

Instead, we offer bonuses, discounts, and free services to make your experience outstanding.
How it works
Receive a 100% original paper that will pass Turnitin from a top essay writing service
step 1
Upload your instructions
Fill out the order form and provide paper details. You can even attach screenshots or add additional instructions later. If something is not clear or missing, the writer will contact you for clarification.
Pro service tips
How to get the most out of your experience with Essay Help Republic
One writer throughout the entire course
If you like the writer, you can hire them again. Just copy & paste their ID on the order form ("Preferred Writer's ID" field). This way, your vocabulary will be uniform, and the writer will be aware of your needs.
The same paper from different writers
You can order essay or any other work from two different writers to choose the best one or give another version to a friend. This can be done through the add-on "Same paper from another writer."
Copy of sources used by the writer
Our college essay writers work with ScienceDirect and other databases. They can send you articles or materials used in PDF or through screenshots. Just tick the "Copy of sources" field on the order form.
Testimonials
See why 20k+ students have chosen us as their sole writing assistance provider
Check out the latest reviews and opinions submitted by real customers worldwide and make an informed decision.
Mathematics
on time and very legit!
Customer 452447, May 18th, 2022
Other
Nice job!
Customer 452459, September 27th, 2022
Classic English Literature
no errors and top-notch grammar
Customer 452451, May 26th, 2022
Other
i love every detail of the paper. am sure i'll get an A+
Customer 452459, September 27th, 2022
Classic English Literature
Awesome Work. Highly recommend the writer
Customer 452461, November 21st, 2022
Classic English Literature
awesome research and organization
Customer 452451, May 26th, 2022
11,595
Customer reviews in total
96%
Current satisfaction rate
3 pages
Average paper length
37%
Customers referred by a friend
OUR GIFT TO YOU
15% OFF your first order
Use a coupon FIRST15 and enjoy expert help with any task at the most affordable price.
Claim my 15% OFF Order in Chat
error: Content is protected !!
Open chat
1
Need assignment help? You can contact our live agent via WhatsApp using +1 718 717 2861

Feel free to ask questions, clarifications, or discounts available when placing an order.